88exporter.com Home       Products Catalog      Suppliers Catalog      Log In        Sign up
      About Us
      Profile
      Products
      Contact Us


Hebei Jinbiao Construction Materials Tech Corp., Ltd.

Products >> Finished bolt links to install solar carport

Finished bolt links to install solar carport

Build Your Online Product Catalogs?



Description
Product Name: Finished bolt links to install solar carport
Supply Ability: 50000
Related proudcts bolted link solar carport, finished solar carport, solar carport,
Specifications Customized
Price Term: FOB
Port of loading: Tianjin
Minimum Order 1
Unit Price: 3500

In traditional concepts, the installation of any large metal structural component is inseparable from the welding operation with flying ***rks. It means the need for professional welders, complex on-site safety management and uncontrollable environmental factors. However, with the emergence of finished bolted solar carports, this stereotype is being completely overturned. Solar-powered carports, with their outstanding convenience, safety and economy, are becoming the new favorite in both industrial and commercial as well as civilian fields.Finished bolt links to install solar carport

Core advantage: Install solar carports like assembling furniture
Imagine installing a fully functional solar carport, just like assembling a set of precise Lego models or a set of high-quality furniture. This is the fundamental transformation brought about by bolt connection technology.

1. An extremely simplified installation process
The entire installation process of a solar carport can be clearly divided into three steps:

Step 1: Foundation and embedded parts. This is the only basic civil engineering work that needs to be completed on site. According to the design drawings, complete the pouring of the concrete foundation and precisely position the embedded parts.Finished bolt links to install solar carport

Step 2: Assembly of the main structure of the solar carport. All the main beams, secondary beams, columns and supporting components have been precisely processed and drilled on the production line. On-site personnel only need to use ordinary tools to connect and tighten each component one by one with high-strength bolts according to the numbers and drawings.

Step 3: Install photovoltaic modules and electrical systems. Fix the solar panels to the assembled steel structure frame, connect the cables and link them to the inverter and the power grid.

The entire process is logically clear and closely linked, greatly reducing the complexity and unpredictability of on-site construction.Finished bolt links to install s

Contact Us
Company: Hebei Jinbiao Construction Materials Tech Corp., Ltd.
Contact: Ms. xianhong li
Address: East District, Industrial Park
Postcode: 053600
Tel: +86 18032099129
Fax:
E-mail:          


Copyright© Hebei Jinbiao Construction Materials Tech Corp., Ltd. All Rights Reserved.
Tel : +86 18032099129 Fax :
Powered by 88exporter.com